Khalifa Port South Quay and Foreshore Marine Works , UAE

Client

Abu Dhabi Ports (*)

Location

Abu Dhabi, UAE

Scope

Marine Structures, Supervision Management

Period

2019 - 2022

(*) Our staff were engaged in th is project under previous employment

Project Snapshot

To support the rapid expansion of Khalifa Port, Abu Dhabi Ports initiated a major expansion programme comprising two new gener al cargo terminals. The project included the construction of a 3 km long quay wall at South Quay with a berthing depth of −18.5 m L AT, and a further 3 km long quay wall along the Foreshore with berthing depths of −8.0 m LAT and −16.0 m LAT. The works also encompassed associated capital dredging, demolition of an existing breakwater, and extensive reclamation and ground improvement wor ks to create approximately 2.65 km2 of new terminal yard area.

Our Involvement

Sevra’s CEO was involved in this project during his tenure at Abu Dhabi Ports, where he served as Engineering Manager. Acting in an owner – side technical role, he led project development, reviewed the detailed design prepared by the specialist marine consul tant, and developed the EPC tender documentation and procurement strategy. This role required close coordination with designers, stakeholders, and internal teams to ensure the proposed solutions were technically robust, buildable, and aligned with port ope rational requirements.

Technical Insight

The project included the casting and installation of 5,317 gravity type pre – cast blocks in the quay wall. All reclaimed land was generated from dredged material. To achieve suitable / compactable material, the unsuitable soil (silts) had to be segregated from the reclamation material. A detailed testing programme was set – up to ensure tight quality control.