Mugharraq Port Development – Marine Works, UAE
Client
Abu Dhabi Ports (*)
Location
Abu Dhabi , UAE
Scope
Marine Structures, Supervision Management
Period
2019 - 2021
Project Snapshot
Abu Dhabi Ports initiated the further development of Mugharraq Port in order to meet and support the growing demand on port infrastructure from current port users as well as the increase in demand due to the growing oil and gas industry in the area. The project included the deepening of the existing basin and the “Delma” entrance channel to -8.0m LAT, the construction of a new 400m long quay wall accommodating a future design depth of -10m LAT, reclamation and soil improvement of the area behind the new quay wall and the construction of a new rock revetment along the perimeters of the new reclaimed area.
Our Involvement
Sevra’s CEO was involved in this project during his tenure at Abu Dhabi Ports, where he served as Engineering Manager. Acting in an owner-side technical role, he led project development, reviewed the detailed design prepared by the specialist marine consultant, and developed the EPC tender documentation and procurement strategy. This role required close coordination with designers, stakeholders, and internal teams to ensure the proposed solutions were technically robust, buildable, and aligned with port operational requirements.
Technical Insight
To service the oil and gas industry, high design loads of 150kPa had to be considered for the quay wall. This was achieved through
careful design of a heavy load combi-wall by a specialist marine contractor and their consultant under the EPC contract.