Sir Bani Yas Cruise Jetty , UAE

Client

Abu Dhabi Ports (*)

Location

Abu Dhabi, UAE

Scope

Marine Structures, Supervision Management

Period

2019 - 2022

(*) Our staff were engaged in th is project under previous employment

Project Snapshot

Abu Dhabi Ports developed a jetty at the southeast corner of Sir Bani Yas Island to facilitate passenger transfer between cruise vessels and the Cruise Beach. The jetty has been operational since December 2016 and was designed to accommodate Oasis – class cruise vessels on both sides of the structure. The project comprised a berthing structure for cruise ships, an open trestle providing pedestrian and light – vehicle access, aids to navigation, firefighting systems, lighting, and a paved pedestrian walkway. The scope also included upgrades to the coastal protection system, including improvements to the existing groynes along the Cruise Beach.

Our Involvement

Sevra’s CEO was involved in this project during his tenure at Abu Dhabi Ports, where he served as Engineering Manager. In this capacity, he acted in an owner – side technical role, leading project development, critically reviewing the detailed design prepared by a specialist marine consultant, and preparing the EPC tender documentation and procurement strategy. The responsibilities and level of technical oversight undertaken were equivalent to those typically performed by an Owner’s Engineer during a construction supervision project.

Technical Insight

Our collaborative, delivery – focused approach was instrumental in ensuring the project progressed efficiently from concept through to construction, reflecting the same technical oversight, coordination, and judgement typically associated with an Owner’s Engineer role.

Chat with us